Maintenance System of Universal Goss Printing Machine based on failure data using RCM and RCS method

  • Judi Alhilman TELKOM UNIVERSITY

Abstract

OverBased on RCM analysis for each critical subsystem obtained interval preventive maintenance for transfer roller 127.60 hours, Ink fountain roller 24.45 hours, ink form roller 29.23 hours respectively, and the wash-up device is no scheduled maintenance. For spare parts inventory strategies the result using RCS method are: transfer roller104 units, ink fountain roller requires 32 units, ink form roller 36 units and are holding spare policy required, and a wash-up device no holding spare parts.


 


Inserted: r


 


Inserted: u


 


Inserted: ng


 


Inserted: foll


 


Inserted: polic


 


Inserted: d


 


Inserted: the


 


Deleted:in acc


 


Deleted:rdance


 


Deleted:th


 


Deleted:i


 


Deleted: accor


 


Deleted:anc


 


Deleted: with


 


Deleted:strateg

Published
2018-09-06
How to Cite
ALHILMAN, Judi. Maintenance System of Universal Goss Printing Machine based on failure data using RCM and RCS method. International Journal of Innovation in Enterprise System, [S.l.], v. 2, n. 01, sep. 2018. ISSN 2580-3050. Available at: <http://ijies.sie.telkomuniversity.ac.id/index.php/IJIES/article/view/61>. Date accessed: 21 sep. 2018. doi: https://doi.org/10.25124/ijies.v2i01.61.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.