The Project Performance Evaluation of PLBN Project Using Earned Value Management Method

  • Malsya Debrina Nur Salsabila Telkom University
  • Ika Arum Puspita Telkom University
  • Sandhy Widyasthana Telkom University
Keywords: Project Monitoring and Controlling, Earned Value Management, CPI, SPI, Project Performance

Abstract

Process of monitoring and controlling projects requires data evaluation activities in the order to find out whether the project is in accordance with the plan to avoid an incompatibility between the planning and the actual time. The failure of construction project almost reached the figure of 20% - 40% which occurred in the project monitoring and controlling process. The purpose of this research is analysis project performance with earned value management method at PLBN Project. This research was carried out by several stages: data collection, data processing and analysis. From the results of the performance index analysis show that the project’s performance on the construction project is still not good. At week 16 the CPI and SPI values are 0.94 and 0.85. Both values can be interpreted that the costs incurred are greater than planning and the implementation time is longer than planning. The result of EAC is Rp. 2.423.695.294 with an estimated completion time is 21 weeks which indicates that there is an additional 3 weeks of completion.

References

[1] PMI. (2017). Project Management Body of Knowledge. Newtown Square, Pennsylvania: 14 Campus Boulevard.
[2] Putu, I. A., Wirahaji, I. B., & Wijaya, I. H. (2019). Pengendalian Proyek dengan Earned Value Management (EVM) pada Proyek Pemeliharaan Jalan Provinsi Denpasar - Simpang Pesanggaran. Jurnal Widya Teknik Vol 13 No 02.
[3] Wiyana, Y. E. (2012). Analisis Kegagalan Konstruksi dan Bangunan dari Perspektif Faktor Teknis. Wahana Teknik Sipil Vol. 17, 77 - 78.
[4] Mulcahy, R. (2018). PMP Exam Prep Ninth Edition. United State of America: RMC Publications.
[5] Widiningrum, A., Haryono, I., & Pratami, D. (2018). Analisis Kinerja Proyek dengan Metode Earned Value Management pada Proyek Shutdown STO Tanjungsari. e-Proceeding of Engineering : Vol.5, No.3.
[6] Maromi, M. I., & Indryani, R. (2015). Metode Earnd Value untuk Analisa Kinerja Biaya dan Waktu Pelaksanaan pada Proyek Pembangunan Condotel De Vasa Surabaya. Jurnal Teknik ITS Vol 4 No 1, 55 - 56.
[7] Sediyanto, & Hidayat, A. (2017). Analisa Kinerja Biaya dan Waktu pada Pelaksanaan Proyek Konstruksi dengan Metode Earned Value (Studi Kasus Proyek Konstruksi Mall dan Hotel X di Pekanbaru). Jurnal Ilmu Teknik dan Komputer.
[8] Priyo, M., & Indraga, K. F. (2015). Analisis Kinerja Biaya dan Jadwal Terpadu dengan Konsep Earned Value Method (Studi Kasus: Proyek Pembangunana Gedung). JURNAL ILMIAH SEMESTA TEKNIKA Vol. 18, No. 2.
[9] Briandhito, C., Puspita, I. A., & Widyasthana, S. (2019). Analisis Kinerja Biaya dan Waktu Menggunakan Metode Earned Value Manajemen dan TCTO untuk Mengoptimalkan Biaya dan Waktu pada Proyek Summarecon Bandung. e-Proceeding of Engineering : Vol.6, No.2.
[10] Hafizh, A. (2018). Analisa Biaya dan Waktu Proyek dalam Proses Kinerja dengan Menggunakan Metode Earned Value. 11 - 17.
[11] Hidayatullohi, T. (2019). Earned Value Pelaksanaan Proyek Pembangunan Kantor Denma Seskoad TNI AD Ditinjau dari Kinerja Waktu Menggunakan Ms. Project. Jurnal IKRA-ITH Teknologi Vol 3 No 1.
[12] Mualim, P. P., Pratami, D., & Bay, A. F. (2020). Monitoring Proyek Ducting FO Kawasan Tahap III Summarecon Bandung Menggunakan Metode Earned Value Management. Seminar Nasional Teknik Industri Universitas Gadjah Mada.
[13] Nicholas, J. M., & Steyn, H. (2012). Project Management for Engineering, Business and Technology. London and New York: Routledge.
[14] Rani, H. A. (2016). Manajemen Proyek Konstruksi. Yogyakarta: Deepublish.
[15] Wahyuni, E., & Hendrawan, B. (2018). Analisis Kinerja Proyek "Y" Menggunakan Metode Earned Value Management (Studi Kasus di PT Asian Sealand Engineering). Journal of Applied Business Administration Vol 2, No 1.
Published
2021-09-01
How to Cite
Nur Salsabila, M., Puspita, I., & Widyasthana, S. (2021, September 1). The Project Performance Evaluation of PLBN Project Using Earned Value Management Method. International Journal of Innovation in Enterprise System, 6(01), 61-73. https://doi.org/https://doi.org/10.25124/ijies.v6i01.139